To view graphic version of this page, refresh this page (F5)

Skip to page body

Transbay Streetscape & Open Space

The Transbay Streetscape & Open Space Plan was approved on November 21, 2006 at the San Francisco Redevelopment Commission meeting. Any questions regarding the this plan should be directed to Project Manager Mike Grisso (mike.grisso@sfgov.org ).

*Note: The following files are Adobe Acrobat PDFs. You will need the Adobe Acrobat Reader to read the following files. The Adobe Acrobat Reader is free and available for download on Adobe's web-site (off-site link - http://www.adobe.com/products/acrobat/readstep2.html).

Transbay Streetscape & Open Space



TABLE-OF-CONTENTS

1.0
INTRODUCTION

1.1
1.2
1.3
1.4
1.5
1.6


Purpose of the Document
Project Description
The Design Process
Design Objectives
Implementing the Plan
Plan Summary



 

 

2.0    DESIGN ELEMENT      
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
  Conceptual Framework
Folsom
Howard & Mission
First & Fremont
Second Street
Beale, Main & Spear, 2-Parts (Pt. 1, and Pt. 2)
Clementina & Tehama
Transbay Park
Street Trees, 3-Parts (Pt. 1, Pt. 2, and Pt. 3)
Materials & Furnishings Family
Under Ramp Areas
Public Art
Wayfinding
     
3.0     MOBILITY ELEMENT      

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15

  Conditions Today
The Need for Change
Building on the Design for Development
Fremont and Folsom Street Off-Ramps

Folsom Street
First Street
Beale & Main Streets
Alleys

Mid-Block Pedestrian Crossings
Casual Carpool Pick-Ups
Parking
Corner Bulb Outs
Transit Services and Amenities
Bicycle Lanes
Next Steps for Environmental Approval
     
4.0     INFRASTRUCTURE ELEMENT      
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9 
  Introduction
Demolition and Reuse
Excavation

Stormwater
Irrigation
Street Lights
Streets

Phasing (...cont'd 4.7)
Current & Future Projects
     APPENDICES
Appendix 1: Street Tree Inventory
Appendix 2: Structural Soil Guidelines
Appendix 3: Structural Soil
Appendix 4: Street Tree Planting
Appendix 5: Special Concrete Colors & Finishes
Appendix 6: References

ACKNOWLEDGMENTS

Transbay Streetscape and Open Space Improvements Project Updates

Folsom Street Schematic Designs
Folsom Street Schematic Designs

October 11, 2012 Community Meeting
Oscar Park Public Workshop 3

July 12, 2012 Community Meeting
Oscar Park Concept Design Update.pdf 
Oscar Park Concept Design Comment Card.pdf

December 8, 2011 Community Workshop
1208 Community Meeting Presentation Part1.pdf
1208 Community Meeting Presentation Part2.pdf 
1208 Community Meeting Presentation Part3.pdf 
1208 Community Meeting Presentation Part4.pdf 
1208 Community Meeting Presentation Part5.pdf 
1208 Community Meeting Presentation Part6.pdf 
1208 Community Meeting Presentation Part7.pdf 
1208 Community Meeting Presentation Part8.pdf 
1208 Community Meeting Presentation Part9.pdf 
1208 Community Workshop Hand Out.pdf 
1208 Posters_Part1.pdf 
1208 Posters_Part2.pdf

-top-

 

 
Last updated: 11/28/2012 11:04:05 AM